Autor
|
Titel
|
Jahr
|
Band Seite
|
|
|
|
|
|
|
Rachoy C., Wergles N. |
METEOROLOGICAL INFORMATION AND WARNING SYSTEM FOR RAILWAY INFRASTRUCTURE - DECISION SUPPORT FOR NATURAL HAZARDS MANAGEMENT [Extended Abstract] |
2008 |
EA 338 - 339 |
|
Bell R., Röhrs M. , Glade T., Dix A. |
COMBINING HISTORIC INFORMATION AND HIGH RESOLUTION DTMS TO IMPROVE THE UNDERSTANDING OF TODAY'S MAXIMUM POSSIBLE LANDSLIDE EVENTS AND ITS RELEVANCE FOR HAZARD ASSESSMENT [Extended Abstract] |
2008 |
EA 34 - 35 |
|
Rauch H.P., Lammeranner W., Niederschick M., Stangl R., Florineth F., Rachoy C. |
A DECISION GUIDANCE FOR THE IMPLEMENTATION OF SOIL BIOENGINEERING TECHNIQUES [Extended Abstract] |
2008 |
EA 340 - 341 |
|
Rickenmann D., Hunzinger L., Koschni A. |
FLOOD EVENTS AND SEDIMENT TRANSPORT DURING THE RAINSTORM OF AUGUST 2005 IN SWITZERLAND [Extended Abstract] |
2008 |
EA 342 - 343 |
|
Rickli C., Bucher H. |
RIPARIAN AND LARGE WOODY DEBRIS SUPPLY IN MOUNTAIN TORRENTS [Extended Abstract] |
2008 |
EA 344 - 345 |
|
Rieger D., Igel W., Dorsch J., Fröhlich H., Hagemeier M., Wagner K. |
2D-MODELLING OF FLOOD PLAINS USING OPTIMIZED INPUT DATA LARGE SCALE APPLICATION AND DISSEMINATION STRATEGIES [Extended Abstract] |
2008 |
EA 346 - 347 |
|
Romang H., Wilhelm C., Frede V., Bérod D. , Hegg C. , Rhyner J. |
EMERGENCY MANAGEMENT TOOLS FOR FLOODS AND DEBRIS FLOW EVENTS IN SMALLER CATCHMENTS [Extended Abstract] |
2008 |
EA 348 - 349 |
|
Rosier B., Boillat J.L., Schleiss A.J. |
OUTFLOW ANGLE FOR SIDE WEIRS AT FLOOD DISCHARGES [Extended Abstract] |
2008 |
EA 350 - 351 |
|
Ruch C., Jørgensen G., Schatzl R. |
SETUP OF A FLOOD FORECASTING SYSTEM FOR THE ENNS RIVER IN STYRIA (AUSTRIA) [Extended Abstract] |
2008 |
EA 352 - 353 |
|
Ruch C., Schatzl R. |
IMPLEMENTATION OF TWO RESEARCH BASINS IN STYRIA (AUSTRIA) TO SUPPORT THE DEVELOPMENT OF FLOOD FORECAST-ING SYSTEMS AT THE SUB-CATCHMENT SCALE. [Extended Abstract] |
2008 |
EA 354 - 355 |
|
Ruff M., Czurda K. |
LANDSLIDE SUSCEPTIBILITY ANALYSIS AT A REGIONAL SCALE - A QUALITATIVE APPROACH AT THE EASTERN ALPS (GEOHAZARD MAP VORARLBERG) [Extended Abstract] |
2008 |
EA 356 - 357 |
|
Sakaguchi T., Iwama M., Nakane K., Goto K., Ishio K. |
LANDSCAPE EVALUATION MODEL FOR GREEN BELT PLAN: AN APPLICATION TO ROKKO MOUNTAIN RANGE IN SETO INLAND SEA NATIONAL PARK [Extended Abstract] |
2008 |
EA 358 - 359 |
|
Bertschi W., Hunziker G., Kienholz H. |
EMPIRICAL MODELS FOR TOTAL BED LOAD ESTIMATION CALIBRATION AND RANGE OF APPLICATION OF DIFFERENT MODELS [Extended Abstract] |
2008 |
EA 36 - 37 |
|
Scheidl C., Rickenmann D. |
DEPOSITIONAL CHARACTERISTICS AND RUNOUT OF ALPINE DEBRIS FLOWS [Extended Abstract] |
2008 |
EA 360 - 361 |
|
Schmidiger V., Schatzmann M., Bianco P., Jäggi M. |
FLOOD PROTECTION URI VALLEY [Extended Abstract] |
2008 |
EA 362 - 363 |
|
Schneiderbauer S., Tschachler T., Hinterberger W., Fischer P., Studeregger A., Podesser A. |
IMPROVING AVALANCHE FORECASTS BY EXTRACTING BOUNDARY CONDITIONS FROM MEASURED WIND DATA AND LOCAL WEATHER MODELS FOR SNOW DRIFT SIMULATION IN ALPINE AREAS [Extended Abstract] |
2008 |
EA 364 - 365 |
|
Schneuwly D., Stoffel M. |
CHANGES IN SPATIO-TEMPORAL PATTERNS OF ROCKFALL ACTIVITY ON A FORESTED SLOPE OVER THE LAST 50 YEARS - A CASE STUDY USING DENDROGEOMORPHOLOGY [Extended Abstract] |
2008 |
EA 366 - 367 |
|
Schober S., Formann E., Habersack H. |
SELF FORMING RIVER PROCESSES IN THE CONTEXT OF RIVER WIDENING AS AN EXAMPLE OF MODERN WATERMANAGEMENT MEASURE IN PRACTICE [Extended Abstract] |
2008 |
EA 368 - 369 |
|
Schoeneich P., Consuegra D. |
A CENTENNIAL RAINSTORM AND FLOOD EVENT IN LES DIABLERETS (SWISS PREALPS) [Extended Abstract] |
2008 |
EA 370 - 371 |
|
Schoeneich P., Hantz D., Deline P., Amelot F. |
A NEW DATABASE OF ALPINE ROCK FALLS AND ROCK AVALANCHES [Extended Abstract] |
2008 |
EA 372 - 373 |
|
Scotton P., De Toni S., Moro F. |
PASSIVE DEFENCE STRUCTURES AGAINST DENSE SNOW AVALANCHES EXPERIMENTAL ANALYSIS [Extended Abstract] |
2008 |
EA 374 - 375 |
|
Seijmonsbergen H. |
DIGITAL GEOMORPHOLOGICAL INFORMATION FOR ALPINE HAZARD STUDIES USING LASER ALTIMETRY DATA AND GIS WITH AN EXAMPLE FROM VORARLBERG, AUSTRIA [Extended Abstract] |
2008 |
EA 376 - 377 |
|
Semadeni N., Bezzola G.R., Weichert R. |
HAZARD ASSESSMENT AND RISK MANAGEMENT IN CASE OF UNSTABLE SLOPES ALONG RIVERS [Extended Abstract] |
2008 |
EA 378 - 379 |
|
Bertschi W., Kienholz H., Weingartner R. |
RUNOFF AND BEDLOAD TRANSPORT EXPERMENTS IN THE SPISSIBACH CATCHMENT [Extended Abstract] |
2008 |
EA 38 - 39 |
|
Siegel H., Schabl A. |
INTEGRATED LAND USE PLANING AND RIVER BASIN MANAGEMENT (ILUP) [Extended Abstract] |
2008 |
EA 380 - 381 |
|
Simonini P., Cola S. |
RELEVANCE OF THREE-DIMENSIONAL STABILITY ANALYSIS FOR TWO LANDSLIDES IN CENTRAL ITALIAN ALPS [Extended Abstract] |
2008 |
EA 382 - 383 |
|
Speerli J., Grob M., Künzi R., Wyss P., Zimmermann M., Pozzi A. |
GLYSSIBACH BRIENZ, SWITZERLAND: FLOOD AND DEBRIS FLOW EVENT ON AUGUST 22/23, 2005 PROTECTION MEASURES AGAINST FUTURE FLOODS AND DEBRIS FLOWS [Extended Abstract] |
2008 |
EA 384 - 385 |
|
Staffler H., Berger E., Sperling M., Macconi P., Volcan C., Zischg A. |
INFORMATION SYSTEM FOR HYDROGEOLOGICAL RISKS (IHR) - A STANDARDIZED PROCEDURE FOR THE COMPILATION OF HAZARD ZONE AND RISK MAPS REGARDING FLOODS AND DEBRIS FLOWS IN THE AUTONOMOUS PROVINCE OF BOLZANO SOUTH TYROL, ITALY [Extended Abstract] |
2008 |
EA 386 - 387 |
|
Staffler H., Pollinger R., Zischg A. |
PRIORITISATION IN THE PLANNING OF PERMANENT PROTECTION STRUCTURES AGAINST FLOODS AND DEBRIS FLOWS ON THE REGIONAL SCALE IN THE AUTONOMOUS PROVINCE OF BOLZANO - SOUTH TYROL [Extended Abstract] |
2008 |
EA 388 - 389 |
|
Staffler H., Prugg H., Pollinger R., Tanzer M., Gögele T. |
ORGANISATION OF THE EMERGENCY PREPAREDNESS PLANNING OF THE DEPARTMENT OF HYDRAULIC ENGINEERING, AUTONOMOUS PROVINCE OF BOLZANO - SOUTH TYROL, ITALY [Extended Abstract] |
2008 |
EA 390 - 391 |
|
Stalder R., Martin S., Covi S. |
"SUSTAINABLE PROTECTION FOREST ALONG STREAMS - THE PROJECT "NASEF" IN THE CANTON OF LUCERNE (SWITZERLAND) [Extended Abstract]" |
2008 |
EA 392 - 393 |
|
Stefanidis P., Kalinderis I., Tziaftani F. |
THE CAUSE AND THE MECHANISM OF THE FLASH FLOODS ON 7-8 OCTOBER 2006 AT STAVROS THESSALONIKI (NORTH GREECE) [Extended Abstract] |
2008 |
EA 394 - 395 |
|
Stiefelmeyer H., Hlatky T. |
HORA - AN AUSTRIAN PLATFORM FOR NATURAL HAZARDS AS A NEW WAY IN RISK COMMUNICATION [Extended Abstract] |
2008 |
EA 396 - 397 |
|
Stoffel L., Margreth S. |
AVALANCHES: SAFETY CONCEPTS FOR TEMPORARY MEASURES AND APPLICATION OF ARTIFICIAL RELEASE [Extended Abstract] |
2008 |
EA 398 - 399 |
|
Berwert J., Wüthrich T., Gertsch E. |
FLOOD CONTROL IN THE SARNERAA VALLEY PARTICIPATIVE PLANNING OF PREVENTIVE MEASURES AFTER THE 2005 FLOODS [Extended Abstract] |
2008 |
EA 40 - 41 |
|
Stoffel M., Bollschweiler M. |
TREE-RING BASED RECONSTRUCTIONS OF PAST DEBRIS-FLOW EVENTS AND ASSESSMENT OF FUTURE RISKS IN 32 TORRENTS OF THE VALAIS ALPS (SWITZERLAND) [Extended Abstract] |
2008 |
EA 400 - 401 |
|
Stoffel M., Conus D., Grichting M.A., Lièvre I., Maître G. |
LATE HOLOCENE DEBRIS-FLOW ACTIVITY ON A FORESTED CONE IN THE SWISS ALPS - LESSONS LEARNED FROM THE PAST - IMPLICATIONS FOR THE FUTURE [Extended Abstract] |
2008 |
EA 402 - 403 |
|
Studeregger A., Rieder H., Podesser A. |
STYRIA: FEBRUARY 2005 - AVALANCHE DANGER LEVEL 5 - MORE THAN 200 AVALANCHES - CONSEQUENCES FOR AVALANCHE PROGNOSIS [Extended Abstract] |
2008 |
EA 404 - 405 |
|
Suda J., Jenni M., Rudolf-Miklau F. |
MAINTENANCE AND MONITORING OF PROTECTION WORKS FOR TORRENT CONTROL IN AUSTRIA [Extended Abstract] |
2008 |
EA 406 - 407 |
|
Supper R., Römer A., Bieber G., Jaritz W., Wöhrer-Alge M. |
AN INTER-DISCIPLINARY APPROACH TO LANDSLIDE HAZARD ASSESSMENT AND MONITORING [Extended Abstract] |
2008 |
EA 408 - 409 |
|
Teufelsbauer H. |
TWO DIMENSIONAL MODELLING OF SNOW TEMPERATURE AND SNOW SETTLEMENT [Extended Abstract] |
2008 |
EA 410 - 411 |
|
Thomi L. |
THE RELEVANCE OF ACTORS' RISK KNOWLEDGE AND ITS INTEGRATION INTO FLOOD RISK MANAGEMENT [Extended Abstract] |
2008 |
EA 412 - 413 |
|
Torii N., Okimura T. |
SOME CONSIDERATIONS ON THE MECHANISM OF SLOPE FAILURES INDUCED BY RAINFALLS AFTER EARTHQUAKE [Extended Abstract] |
2008 |
EA 414 - 415 |
|
Vanomsen P., Egli T. |
BUILDING VULNERABILITY AND THE EFFECTIVENESS OF PROP-ERTY PROTECTION MEASURES [Extended Abstract] |
2008 |
EA 416 - 417 |
|
Volcan C., Staffler H. |
INFORMATION SYSTEM FOR HYDROGEOLOGICAL RISKS (IHR) - A PROCEDURE FOR THE CREATION OF HAZARD INDICATION MAPS FOR ALPINE RIVERS [Extended Abstract] |
2008 |
EA 418 - 419 |
|
Bezzola G.R. |
"UNEXPECTED PROCESSES IN A SEDIMENT RETENTION BASIN THE "STIGLISBRÜCKE" BASIN ON THE SCHÄCHEN TORRENT DURING THE FLOOD OF AUGUST 2005 [Extended Abstract]" |
2008 |
EA 42 - 43 |
|
Volkwein A., Wendeler C., McArdell B., Denk M., Roth A., Wartmann S. |
LOAD MODEL FOR THE INTERACTION BETWEEN DEBRIS FLOWS AND FLEXIBLE BARRIERS [Extended Abstract] |
2008 |
EA 420 - 421 |
|
von Elverfeldt K., Glade T. |
DEVELOPMENT OF A MULTIHAZARD AND MULTIRISK CONCEPT [Extended Abstract] |
2008 |
EA 422 - 423 |
|
Vondrak D. |
INTEGRATED FLOOD CONTROL HARD [Extended Abstract] |
2008 |
EA 424 - 425 |
|
Vondrak D. |
WATERS MANAGEMENT CONCEPT DORNBIRNERACH [Extended Abstract] |
2008 |
EA 426 - 427 |
|